Low-Volume Production Run (50–5,000 Parts)
$1,900 – $9,800
Bridge production with locked process control: FAI on the first article, SPC at every operation, blanket-order scheduling.
| Lead time | 2–3 weeks typical |
|---|---|
| Quantity | 50–5,000 parts per batch |
| Quality | FAI + in-process SPC |
| Scheduling | Blanket orders & kanban |
The gap between prototype and hard tooling is where programs live or die. Our low-volume runs lock in fixturing, CNC programs and inspection plans, so part 5,000 measures like part 1. First article inspection to AS9102 comes standard on aerospace work; kanban release scheduling is available on request.