Low-Volume Production Run (50–5,000 Parts)

$1,900 – $9,800

Bridge production with locked process control: FAI on the first article, SPC at every operation, blanket-order scheduling.

Lead time2–3 weeks typical
Quantity50–5,000 parts per batch
QualityFAI + in-process SPC
SchedulingBlanket orders & kanban

The gap between prototype and hard tooling is where programs live or die. Our low-volume runs lock in fixturing, CNC programs and inspection plans, so part 5,000 measures like part 1. First article inspection to AS9102 comes standard on aerospace work; kanban release scheduling is available on request.